newsNational Energy Commission of Ukraine (NERC) introduced a new draft of Changes to Procedure on Determination of Local Content Requirement (LCR) for Power Plants, Including Commissioned Construction Lines of Power Plants (Launching Complexes) Producing Electricity from Alternative Energy Sources (Except for Furnace and Coke Gas.

The Draft mostly concerns the package of documents to be filed with NERC for the purpose of LC determination and its consideration. 

The document in Ukrainian is available HERE.